Jilin Vienna Hotel BIPV
 
 
 
Time: 2017
Location: Changchun, Jilin
Capacity: 175KW
Installed area:1006㎡
Project Characteristics: 
BIPV is connected with the surrounding curtain wall through a special structure, and the waterproof pipeline is pre-embedded in advance, which is simple and inexpensive to construct. While ensuring power generation, it is sturdy and durable, thermal insulation, waterproof and moisture-proof.
Copyright © 2021 GAIN SOLAR All Rights Reserved